Swansea Medical Centre

Swansea Medical Centre On behalf of the client, Newcastle-based Catalyst Consulting called competitive tenders for this project, and the tender of Graph was accepted.  The contract was a design and construction contract (modified AS4902-2000) and, at the time of tender, development consent was in place and the design development was some 75% complete.  Graph engaged…